CASE STUDY
Dover College Performing Arts Centre
Construction of a new performing arts centre designed to provide a modern, flexible space for education and performance.
Client
Dover College
Main Contractor
Gen One Construction
Brief
A full M&E design and installation was required, incorporating renewable technologies and delivering a complete building services solution aligned with the new build programme.
Our Approach
EMH delivered a full Mechanical & Electrical design through to Stage 5, working alongside the project team to ensure all systems were fully coordinated and integrated.
The project combined traditional building services with renewable technologies to support long-term efficiency and performance.
Scope of Works
Enabling works including site power and welfare
M&E design development to Stage 5
Full electrical installation
Fire alarm and emergency lighting
Lighting design and control
Voice & data infrastructure
Security and CCTV systems
Solar PV installation
Fire connectivity systems
Dry riser installation
VRV heating and cooling system
Plumbing and drainage
Ventilation systems
Sanitary ware installation
Access control systems
External lighting
Delivery
Delivered over a 9-month programme, coordinating multiple trades including electrical, HVAC and specialist systems.
Out-of-hours working supported programme efficiency and timely completion.
Outcome
A fully integrated and energy-efficient M&E solution delivered for a modern education facility, designed for long-term performance and flexibility.